Description -
AC phase BC line-to-line RMS voltage
measurement is below the factory-set
disconnection threshold.
Severity Level - 3
Troubleshooting -
No action is required. When the grid recovers, the inverter will return
to normal operation. If this event appears more frequently than
expected, contact Schneider Electric for assistance.